Problem Statement
The client required a robust and secure platform to accommodate 7-10 workers while installing 400-500 kg glass panels on a mall ceiling. The challenge lay in ensuring the safety of the workers while enabling efficient installation in a demanding work environment.
Our Solution
We provided a 10.2-meter façade system tailored to meet the client’s needs. This solution offered:
- A spacious and secure platform to hold the entire team.
- Enhanced efficiency, enabling the task to be completed three times faster than conventional methods.
- A safe and reliable structure, ensuring a risk-free installation process.
Pain Points Resolved
- Safety Concerns: The platform offered a secure working environment for handling heavy glass panels, eliminating potential hazards.
- Team Accommodation: Designed to support 7-10 workers, the façade ensured collaborative and smooth operations.
- Installation Speed: With our innovative solution, the installation was completed three times faster, saving time and reducing costs.
- Efficient Workflow: The platform facilitated seamless coordination among workers, improving overall productivity.
Our façade system not only addressed the client’s immediate needs but also reinforced our commitment to delivering solutions that prioritize safety, efficiency, and innovation.