Addressing Complex Multi-Floor Installation Challenges 

Installing glass railings across the center space of a multi-floor building is a complex task. The challenge lies in maintaining unobstructed pathways, ensuring worker safety, and enabling seamless access across all floors while other construction activities continue uninterrupted

Takenaka India Private Limited faced this challenge while executing a large-scale project. They needed a solution that ensured safe, efficient, and simultaneous work without compromising other ongoing activities at the site. 

The Challenge: Ensuring Safety, Access, and Unobstructed Movement 

Takenaka India encountered several critical issues during their project: 

1. Obstruction-Free Pathways: Ensuring smooth movement of workers and materials without blocking access points or disrupting other site activities. 

2. Safe Top-Floor Access: Creating a platform for seamless glass railing installation on the top floor while ensuring worker safety. 

3. Efficiency Across Multiple Floors: Facilitating simultaneous work across all floors to save time and reduce costs. 

The client required a tailored solution to meet these specific needs while maintaining safety, efficiency, and workflow continuity. 

The Solution: Y Equipment Services’ Custom Bridge-Cum-Façade System 

To address these challenges, Y Equipment Services provided a custom-designed bridge-cum-façade system that facilitated seamless movement, enhanced safety, and improved efficiency. 


Key Features of the Solution

Dedicated Passage: The façade included openings to enable uninterrupted pathways for workers and materials across all floors. 

Comprehensive Coverage: A single-phase setup allowed multiple workers to operate simultaneously, covering the entire area efficiently. 

Top-Floor Safety Platform: A fully covered platform on the top floor ensured safe and smooth completion of glass railing installation. 

The Impact: Accelerated Project Completion and Cost Savings 

Y Equipment Services’ custom solution delivered significant improvements in project execution: 

Time Savings: The project was completed within 2 months instead of 3 months, enabling the client to finish ahead of schedule. 

Cost Reduction: By reducing project time, the client saved approximately ₹1,000 per day per worker, totaling savings for 20 workers. 

Unobstructed Workflow: The dedicated passage facilitated smooth movement of manpower and materials without disrupting other activities. 

Improved Safety and Efficiency: The top-floor platform ensured worker safety while enabling efficient installation of glass railings. 

Conclusion: Revolutionizing Multi-Floor Installations 

Y Equipment Services’ innovative bridge-cum-façade system allowed Takenaka India to achieve a safer, faster, and more cost-effective glass railing installation. By combining efficient design with safety-first principles, the solution ensured the project was delivered on time and within budget without disrupting ongoing work. 