Problem Statement
Keystone Solutions faced a challenge in completing interior work at the top of an open staircase area in a mall. The customer needed a safe and efficient solution to access the ceiling without obstructing the stairway below.
Our Solution
Y Equipment Services provided a custom bridge with a 6.1-meter beam length at a 2.7-meter height. This solution created a safe environment for workers and allowed them to reach the roof easily without the risk of scaffolding instability.
Pain Points Resolved
- Safe Access: The bridge covered the open area, enabling workers to reach the roof safely without the risk of toppling or falling scaffolding.
- Spacious Platform: The large platform area provided sufficient space for multiple workers to operate simultaneously, without blocking access to the stairs in the center of the mall building.
- Increased Productivity: The safe and efficient setup helped the customer increase productivity while maintaining all necessary safety precautions.
By implementing this solution, Keystone Solutions was able to complete their interior work efficiently and safely, ensuring minimal disruption to the mall’s operations.