Problem Statement
Micron Electricals faced a significant challenge while performing electrical work on the ceiling of an auditorium. The task required placing scaffolding in the staircase area, which was not only time-consuming but also posed safety risks due to the staircase configuration.
Our Solution
Y Equipment Services provided a custom façade-cum-bridge structure specifically designed for staircases. This innovative solution allowed the workers to perform their tasks safely and efficiently, significantly reducing the time required for the project.
Pain Points Resolved
- Time Efficiency: The solution saved a considerable amount of time for the client, allowing the project to be completed in 15-20 days instead of 1.5 months.
- Cost-Effectiveness: The solution was very cost-effective, requiring less manpower and avoiding the need for frequent shifting.
- Safety: The custom structure ensured that the work could be carried out safely, even in the challenging staircase area.
- Manpower Reduction: The client was able to reduce the number of workers from 35 to 15, thanks to the large platform width provided by the solution.
By implementing this solution, Micron Electricals was able to complete their project more efficiently, safely, and cost-effectively.