Executing MEP (Mechanical, Electrical, and Plumbing) work at a height of 24 meters in a working airport environment is a formidable task. The need to avoid blocking ground space while ensuring safety and efficiency posed significant challenges. 

The client required a work platform at 24m height with a length of 8 meters and a width of 4.5 meters, capable of withstanding high loads. Stability, quick assembly, and minimal disruption to airport operations were key requirements. 

The Challenge: Meeting Demands of Safety, Efficiency, and Innovation 

The project faced multiple challenges: 

1. Material Shifting and Installation: Moving and installing scaffolding at 24m height was labor-intensive and risk prone. 

2. Stability Concerns: Ensuring structural stability and ample load capacity at such a height was critical for worker safety. 

3. Space Constraints: The solution needed to avoid ground space usage in the airport, ensuring operational continuity. 

4. Time-Sensitive Setup: The scaffold had to be lightweight and quickly assembled to minimize downtime and reduce risks. 


The Solution: India’s First Hanging Scaffold System 

To address these challenges, Y Equipment Services, backed by its R&D and Technical teams, introduced an innovative Hanging Scaffold Solution – the first of its kind in India. 

Key Features of the Solution: 

Custom-Designed Hanging Scaffold: Tailored to meet the client’s requirements, the scaffold featured an 8-meter beam constructed using advanced CMT Welding Technology for enhanced durability and stability. 

Certified Safety Standards: The system underwent rigorous tests and achieved TUV certification, ensuring safety and compliance at a height of 24m. 

Ease of Assembly: Designed for quick and simple assembly, the scaffold was installed in just 2 hours, minimizing project delays and risk. 

Lightweight and Efficient: The lightweight structure required minimal human effort, reducing project time and labor costs. 

The Impact: Redefining Efficiency and Safety 

Unprecedented Innovation: The Hanging Scaffold introduced by Y Equipment Services was the first in India, setting a new benchmark for high-altitude work solutions. 

Time Efficiency: The scaffold’s quick assembly enabled the client to complete the setup in just 2 hours, significantly accelerating project timelines. 

Safety and Stability: Rigorous testing and TUV certification ensured maximum safety, eliminating risks at 24m height. 

Cost Savings: The lightweight design and reduced labor requirements helped lower project costs while maintaining high productivity. 

Pioneering High-Altitude Solutions in India 

Y Equipment Services’ custom-designed Hanging Scaffold transformed the approach to high-altitude MEP work in India. By introducing a lightweight, efficient, and safety-certified solution, the project not only met but exceeded client expectations, demonstrating Y Equipment Services’ commitment to innovation and excellence. 