Mumbai Metro Project

Problem Statement

Needed to work on the 3-9 o clock part of the tunnel which was difficult to access

Y Equipment Services Solution

 We provided an easy to move Both Side Cantilever Scaffolding tower that aided working on all three sides of the tunnel- left, top and right side. 

The pain points we resolved- 

The scaffold was extremely light weight and easily movable.  

One solution to easily access all three sides of the tunnel.

Easy to access and the tower had ample space to keep all tools and machinery without the need of getting down to collect equipment