fbpx

Insights & Case Studies

  1. Home
  2. »
  3. Insights & Case Studies

Problem Statement The client faced inefficiencies in structural and electrical work at height due to the

Problem Statement The client required a robust and secure platform to accommodate 7-10 workers while installing

Problem Statement  Takenaka India Private Limited needed to install glass railings across the center space of

Problem Statement  Micron Electricals faced a significant challenge while performing electrical work on the ceiling of

Problem Statement  Keystone Solutions faced a challenge in completing interior work at the top of an

Problem Statement  The client needed to cover a length of 12-13 meters for their project but

Problem Statement: Due to the track’s variable gauges and the beams’ limited overhead space, the customer

Problem Statement Needed a single solution for several contractors hired by L&T without taking up space

Problem Statement A Jhoomer at the main reception hall of the Hotel had to be cleaned,

Problem Statement The client required glass roof glazing at a height of 14.2 mts at the

Problem Statement Work Platform requirement for MEP work at 24m height without blocking ground space, since it